中国项目管理职位
空缺将达4600万! 数据来源:PMI发布:《项目管理就业增长与人才缺口报告(2017-2027)》建筑工程行业
医疗健康行业
IT互联网行业
零售行业
机械制造行业
房地产行业
电商行业
教育行业
电子行业
金融行业
- 班型 全程畅学班
- 模块
《pmbok(第七版)》精讲
章节训练题
敏捷项目管理专题
《pmbok(第七版)》串讲
仿真密训
考前点睛
- 配套资料
纸质赠送:
《pmbok(第七版)》精讲教案 《章节解考训练》
电子上传:
《敏捷项目管理专题讲义》
《pmbok(第七版)》串讲教案
《仿真密训2套卷》《考前复习圈点》
- 学习服务
1.小优督学智能学习提醒通知;
2.学员专属APP题库训练;
3.专享专职教研VIP2答疑通道;
4.协助进行英文报名;
5.PMI授权颁发的35个学时培训证明
产品:自报班日起,享受连续四次考试机会且一年内课程免费学习,纸质资料只邮寄一次
- 价格(元)
- 班型
线上集训班
- 模块
《pmbok(第七版)》精讲
章节训练题
敏捷项目管理专题
《pmbok(第七版)》串讲
仿真密训
项目管理全流程实战
考前集训
- 配套资料
纸质赠送:
《pmbok(第七版)》精讲教案 《章节解考训练》 电子上传:
《敏捷项目管理专题讲义》
《项目管理实战修炼手册》《仿真密训2套卷》
《pmbok(第七版)》串讲教案 《集训教案》
- 学习服务
1.小优督学智能学习提醒通知;
2.学员专属APP题库训练;
3.专享专职教研VIP3答疑通道;
4.小优自习室云空间畅享学习;
5.纸质邮寄配套学习资料包邮到家;
6.协助进行英文报名;
7.PMI授权颁发的35个学时培训证明。
产品:自报班日起,享受连续四次考试机会且一年内课程免费学习,纸质资料只邮寄一次
- 价格(元)
每日一练,保持手感,提前掌握备考方向
每日一练 保持手感
"- 01 单选题 Free float is the amount of time that an activity may be delayed with out affecting the _____.
A.Early start of the succeeding activities.
B.Late start of the succeeding activities.
C.Project finish.
D.Cost of the project.
- 02 单选题 Deflection involves the transfer of risk by:
A.Contracting out to another party
B.Developing schedule alternative.
C.Establishing functions under the project manager to handle risk events.
D.Disaster planning and responses.
- 03 单选题 The Pareto Principle is a technique used by quality managers to determine which quality control problems of a particular service or manufacturing process should be corrected. Which of the following statements represents the philosophy of the principle?
A.In order to minimize financial losses from quality control problems, all problems which have a measurable cost associated with them should be corrected.
B.the majority of defects are caused by a small percentage of the identifiable problems. Improvements efforts should be reserved for these vital few problems.
C.in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be corrected.
D.generally, 80 % of the quality control problems are justifiable for correction via cost-benefit analysis. The remaining 20% are not financially worthy of improvement efforts.
- 04 单选题 The identification, definition, and selection of the project objectives as well as the best approach to achieving the project objectives are indentified in the _____ phase of the project but first documented in the project _____.
A.Conceptual, charter/baseline.
B.Conceptual, master schedule.
C.Development, charter/baseline.
D.Development, master schedule.
资深师资联手 为你成功冲关
- 01 项目管理的意义有哪些
项目进度合理安排,有效控制节约成本。在项目管理中进行工作分解可以尽早地制定出项目的任务组成,项目管理人合理安排各项任务的先后顺序,有效安排资源的使用,特别是项目中的关键资源以及重点资源,从而保证项目的顺利实施,并有效降低项目成本。
- 02 PMP证书值含金量怎么样?
PMP由美国项目管理协会(PMI)在全球206个国家和地区同步推出,是目前项目管理领域高含金量的认证之一,PMP是具备国际水准的项目管理专业素质、实战技能、综合性的项目管理人才,现如今,企业在做项目时会优先考虑持有PMP证书的项目经理,企业认可度高。
- 03 PMP是什么
PMP指的是项目管理专业人士资格认证,它是由美国项目管理协会PMI发起的,严格评估项目管理人员知识技能是否具有高品质的资格认证考试。其目的是为了给项目管理人员提供统一的行业标准。
- 04 PMP考试怎么备考?
开考后可以先将计算题公式或自己不熟悉的知识点默写到草稿纸上,以免做题时间过长造成混淆,及时调整状态,闷头做题,保证每题一分钟的速度,并不断根据教室内时间调整自己的做题速度,如果中间感觉效率很低比较晕时,可以上个洗手间,出去转一转。